[Report of the Medical Officer of Health for Poplar, Metropolitan Borough].

  • Poplar (London, England). Metropolitan Borough.
Date:
[1944]

Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

Credit: [Report of the Medical Officer of Health for Poplar, Metropolitan Borough]. Source: Wellcome Collection.

    7/8 (page 6)