The prevention of disease / [by various authors] ; translated from the German ; with an introduction by H. Timbrell Bulstrode.
- Date:
- 1902
Licence: In copyright
Credit: The prevention of disease / [by various authors] ; translated from the German ; with an introduction by H. Timbrell Bulstrode. Source: Wellcome Collection.
Provider: This material has been provided by The University of Leeds Library. The original may be consulted at The University of Leeds Library.
78/1090 (page 56)
