The family health maintenance demonstration : a controlled long term investigation of family health. Proceedings of a round table at the 1953 Annual Conference of the Milbank Memorial Fund.
- Milbank Memorial Fund
- Date:
- 1954
Licence: Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)
Credit: The family health maintenance demonstration : a controlled long term investigation of family health. Proceedings of a round table at the 1953 Annual Conference of the Milbank Memorial Fund. Source: Wellcome Collection.
250/261 (page 245)
