Hints to the sick, the lame, and the lazy; or, passages in the life of a hydropathist / By a veteran.

Date:
1848

Licence: Public Domain Mark

Credit: Hints to the sick, the lame, and the lazy; or, passages in the life of a hydropathist / By a veteran. Source: Wellcome Collection.

    89/140 page 69