Volume 1
Geologic literature on North America, 1785-1918 / by John M. Nickles.
- John Milton Nickles
- Date:
- 1923-1924
Licence: In copyright
Credit: Geologic literature on North America, 1785-1918 / by John M. Nickles. Source: Wellcome Collection.
1093/1180 page 1087
![Wharton, Joseph. 97 Nickel and cobalt. U S G S, An Rp 18 pt 5 : 329-342 (1897) Wheat, Alfred W. 7S Report on the geology of Medina Co. Ohio G S, Rp 3 pt 1 : 362-380, map (1878) Wheatley, Charles M. 61 Remarks on the Mesozoic red sand¬ stone of the Atlantic slope and notice of the discovery of a bone bed therein, at Phoenixville, Pa. Am J Sc (2) 32: 41-4S (1861) 71 Notice of the discovery of a cave in eastern Pennsylvania containing remains of post-Pliocene fossils ... Am J Sc (3) 1 : 235-237 (1871) Wheelan, F. H. 60 The gas well at Summerland. Cal St M Bur, An Rp 10:601-603 (1890) Wheeler, Arthur O. 07 Nakimu caves [British Columbia]. Can, Dp Interior, Rp Surveyor-General 1906:103-117 (1907) 07a Observations on the Yoho Glacier. Can Alpine J 1:149-156 (1907) 08 Motion of the Yoho Glacier [B. C.]. Can Alpine J 1:271-275 (1908); 2:97- 09 (1909); 2:121-125 (1910) 10 Some characteristics of the Canadian Rockies (abst). Brit As, Rp 79:533-534 (1910) 11 Motion of the Yoho Glacier [B. C.]. Can Alpine J 3 : 123-126 (1911) 13 Motion of the Yoho Glacier [B. C.]. Can Alpine J 5:53-58 (1913) 15 Motion of the 5Toho Glacier 1912- 1914. Can Alpine J 6:133-138 (1915) 15a Robson Glacier [B. C.]. Can Alpine J 6:139-142 (1915) 17 Motion of the Yoho Glacier, 1914- 1916 [B. C.]. Can Alpine J 8:118-120 (1917) IS Motion of the Yoho Glacier, 1916— 1917. Can Alpine J 9 : 76-7S (1918). Wheeler, Charles Gilbert (1836-1912). SO An elementary guide to determina¬ tive mineralogy... 75 pp, Chicago 1880 Wheeler, Edward S. 76 Scheybichi and the strand, or early days along the Delaware ... to which is ap¬ pended a geological description of the shore of New Jersey [“ geological outlines and items,” pp. 94-116]. 116 pp, Phila 1876 Wheeler, George D. 03 Zinc in Crittenden Co., Ky. Eng M J 74 : 413-414 (1902) Wheeler, George Montague (1842-1905). 70 Preliminary report of the general features of the military reconnaissance through southern Nevada. 20 pp [n p, 1870?] Wheeler, George Montague—Continued. 73 Preliminary report of explorations in Nevada and Arizona. U S, 42d Cong 2d sess, S Ex Doc 65 : 94 pp, map (1872) 73a Preliminary report concerning ex¬ plorations and surveys principally in Ne¬ vada and Arizona 1871 [notes on mining districts in part furnished by G. K. Gilbert and others]. 96 pp, map, Washington 1872 73b Report of explorations and surveys in Nevada, Utah, Arizona. U S [Wax- Dp], Chief Eng, An Rp 1872 (U S, 42d Cong 3d sess, H Ex Doc 1 pt 2 v 2) App DD: 1124-1176 (1872) 73 Annual report upon the geographical and geological surveys and explorations west of the 100th meridian in Nevada, Utah, Colorado, New Mexico, and Arizona. 11 pp, map, Washington 1873 Also in U S [War Dp], Chief Eng, An Rp 1873 (U S, 43d Cong 1st sess, H Ex Doc 1 pt 2 v 2) App EE: 1211-1218 (1873) 74 Annual report upon the geographical explorations and surveys west of the 100th meridian in California, Nevada, Utah, Ari¬ zona, Colorado, New Mexico, Wyoming, and Montana. 130 pp, map, Washington 1874 Also in U S [War Dp], Chief Eng, An Rp 1874 (U S, 43d Cong 2d sess H Ex Doc 1 pt 2 v 2 pt 2) App FF : 480-606 (1874) 74a Progress report upon geographical and geological explorations and surveys west of the one hundredth meridian in 1872 [notes on mining disti-icts in part furnished by G. K. Gilbert, E. E. Howell, and others]. 56 pp, Washington 1874 74b Geographical and geological explo¬ rations and surveys west of the 100th meridian. Am J Sc (3) 7 : 388-391 (1874) 75 Annual x-eport upon the geographical explorations and surveys west of the one hundredth meridian, in California, Ne¬ vada, Nebraska, Utah, Arizona, Colorado, New Mexico, Wyoming, and Montana. 196 pp, maps, Washington 1875 Also in U S [War Dp], Chief Eng, An Rp 1875 (U S, 44th Cong 1st sess, H Ex Doc 1 pt 2 v 2 pt 2) App LL: 921-1108 (1875) 75a Preliminary report upon a recon¬ naissance through southern and southeast¬ ern Nevada made in 1869. 72 pp, map, Washington 1875 76 Aixnual report upon the geographical surveys west of the one hundredth meridian in California, Nevada, Utah, Colorado, Wyoming, New Mexico, Arizona, and Mon¬ tana. 355 pp, maps, Washington 1876 Also in U S [WTar Dp], Chief Eng, An Rp 1876 (U S, 44th Cfong 2d sess, H Ex Doc 1 pt 2 v 2 pt 3) App JJ : 219-563 (1876) 76:i (in charge) Geological atlas pro¬ jected to illustrate geographical explora¬ tions and surveys west of the 100th merid¬ ian of longitude... [for sheets published, see U S G S, B 222; 63] [1876—J 28737°—23——69](https://iiif.wellcomecollection.org/image/b29979869_0001_1093.jp2/full/800%2C/0/default.jpg)


