Diagnóstico y correccion óptica de la refraccion estática / por el Dr Pedro Lagleyze.
- Lagleyze, Pierre.
- Date:
- 1893
Licence: Public Domain Mark
Credit: Diagnóstico y correccion óptica de la refraccion estática / por el Dr Pedro Lagleyze. Source: Wellcome Collection.
Provider: This material has been provided by The Royal College of Surgeons of England. The original may be consulted at The Royal College of Surgeons of England.
68/104 page 68



