[Report of the Medical Officer of Health for London, City of ].

  • City of London (London, England). Corporation of London.
Date:
[1951]

Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

Credit: [Report of the Medical Officer of Health for London, City of ]. Source: Wellcome Collection.

    4/16 (page 2)