[Report of the Medical Officer of Health for Tower Hamlets, London Borough].
- Tower Hamlets (London, England). London Borough.
- Date:
- [1970]
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: [Report of the Medical Officer of Health for Tower Hamlets, London Borough]. Source: Wellcome Collection.
57/168 (page 41)
