The anatomy of the humane body abridged; or, a short and full view of all the parts of the body. Together with their several uses drawn from their compositions and structures / [By J. Keill].

  • James Keill
Date:
1698

Licence: Public Domain Mark

Credit: The anatomy of the humane body abridged; or, a short and full view of all the parts of the body. Together with their several uses drawn from their compositions and structures / [By J. Keill]. Source: Wellcome Collection.

    72/376 page 40