[Report of the Medical Officer of Health for Poplar, Metropolitan Borough].
- Poplar (London, England). Metropolitan Borough.
- Date:
- [1949]
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: [Report of the Medical Officer of Health for Poplar, Metropolitan Borough]. Source: Wellcome Collection.
15/16 page 13
No text description is available for this image
No text description is available for this image
No text description is available for this image