[Report of the Medical Officer of Health for Enfield].
- Enfield (London, England). London Borough.
- Date:
- [1974]
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: [Report of the Medical Officer of Health for Enfield]. Source: Wellcome Collection.
83/88 (page 71)
