[Report of the Medical Officer of Health for Enfield].
- Enfield (London, England). London Borough.
- Date:
- [1972?]
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: [Report of the Medical Officer of Health for Enfield]. Source: Wellcome Collection.
124/130 (page 114)
