Sales catalogue : Nicholas, Jenner and Dell
- Date:
- 08 November 1915
- Reference:
- WA/HMM/CM/Sal/24/212
Licence: Public Domain Mark
Credit: Sales catalogue : Nicholas, Jenner and Dell. Source: Wellcome Collection.
47/70 page 37
No text description is available for this image
No text description is available for this image
No text description is available for this image![526 ao] 528 529 53° 564. 37 Third Day An old. engraving, ‘“‘Christ in the Manger,” another “The Creation of Eve’ and another by Le Bas, after Teniers An old mezzotint ‘‘The Widow Costard’s Cow and Goods Destrained for Taxes ”’ : A pair of old engravings after Hogarth Four old engravings A pair of framed photographs of King Edward VII..and Queen Alexandra—autographed by Their Majesties A water colour framed and glazed, 3 photographic reproductions of masterpieces, framed passe partout and an old engraving ** March of the Guards,” by C. Sheringham, after Atkinson First Floor Landing, Half Landing and Staircase to Ground Floor. The three-quarter green ground Axminster carpet as laid to Landing and Stairs, about 8 yds. A similar lot, Twenty-three triangular brass stair rods The brown felt carpet as planned, about 8 sq. yds. A Persian rug with red and drab centre, 6 ft. 3 m. by 4 ft. A pair of green plush curtains with valance and holders A similar lot A similar lot An old oak buffet, fitted 3 drawers with panelled fronts and baluster frame, 3 ft. 7 ™. An old brass tankard, 7 7. An old mahogany 2-flap table with shaped top, inlaid with stars, on square tapered supports, diameter 25 imn- A set of 4 old walnut chairs, the backs inlaid with heraldic CEVICESs carved stretcher rails at per chair An old walnut shaped-front cabinet, enclosed by 4 panelled doors, 6 ft. wide](https://iiif.wellcomecollection.org/image/b33155227_0047.jp2/full/800%2C/0/default.jpg)