Volume 10

Reports of the Sleeping Sickness Commission of the Royal Society.

  • Royal Society (Great Britain). Sleeping Sickness Commission
Date:
1903-19

Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

Credit: Reports of the Sleeping Sickness Commission of the Royal Society. Source: Wellcome Collection.

Provider: This material has been provided by Royal College of Physicians, London. The original may be consulted at Royal College of Physicians, London.

    4/128