Volume 4
Reports of the Sleeping Sickness Commission of the Royal Society.
- Royal Society (Great Britain). Sleeping Sickness Commission
- Date:
- 1903-19
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: Reports of the Sleeping Sickness Commission of the Royal Society. Source: Wellcome Collection.
Provider: This material has been provided by Royal College of Physicians, London. The original may be consulted at Royal College of Physicians, London.
5/102



