[Report of the Medical Officer of Health for Holborn Borough].
- Holborn (London, England). Metropolitan Borough.
- Date:
- [1932]
Licence: Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)
Credit: [Report of the Medical Officer of Health for Holborn Borough]. Source: Wellcome Collection.
75/112 page 75



